6900 Hunters Knoll Remodel Project

September 7th

Garage framing progresses!

    Here's a first look at how
    the garage roof will work.
    This view from the front left
    side of the garage shows the
    slope of the front of the garage
    roof compared to the much
    flatter slope of the back of the
    roof.
    Here's a closer look at the
    roof detail.
    The inside of the garage
    looks HUGE from this view.

    The floor of the (admittedly
    odd) attic is floored.

    The opening in the ceiling is
    for a drop-down stair unit.