The siding is complete on the South
side of the house. There's a beveled,
leaded-glass window being made (I'm told)
for this lovely kitchen window. |
|
The frame for the top level of
the new deck is in place. You may
recall that this will be a two-
level deck. The lower level will
extend past the double doors. |
|
This support beam, bolted to the
wall below the library french doors,
indicates where then lower deck will
end. |
|
Here's a new look from the North
side of the back yard. You can see
then new deck (well the upper-level).
The 2x4 supports are temporary
(I'm sure you're happy to hear that!) |
|
Here's what the back of the
library looks like (at least with
part of the siding finished). |
|
And, finally, if you strain,
you can see the windows in the
back of the garage. |
|