Finishing up the outdoor work...

    The siding is complete on the South
    side of the house. There's a beveled,
    leaded-glass window being made (I'm told)
    for this lovely kitchen window.
    The frame for the top level of
    the new deck is in place. You may
    recall that this will be a two-
    level deck. The lower level will
    extend past the double doors.
    This support beam, bolted to the
    wall below the library french doors,
    indicates where then lower deck will
    end.
    Here's a new look from the North
    side of the back yard. You can see
    then new deck (well the upper-level).

    The 2x4 supports are temporary
    (I'm sure you're happy to hear that!)
    Here's what the back of the
    library looks like (at least with
    part of the siding finished).
    And, finally, if you strain,
    you can see the windows in the