6900 Hunters Knoll Remodel Project

July 24th

    The temporary door into the kitchen
    has been removed and the opening
    boarded up until the window can be
    installed.
    The door (now permanent) has been
    moved to it's ultimate location and
    now leads into what will be the back
    hall.
    The grading of the garage floor
    and the crawl space beneath the
    family room have been completed.
    The wall to the left is the one
    that will be moved (to the left)
    five feet.
    This view looks down at the new
    footing that's been dug for the wall
    that will be moved.  Actually, we're
    keeping the wall (costs more to de-
    molish) and putting up a new one
    atop that footing.
    We had dinner with Joe and Cathleen
    Blumberg on Thursday night and showed
    them the plans.  Joe didn't like the
    layout for the 1/2 bath, closet, hall
    and laundry room so he drew up the
    "right" way to do this on a Rio Bravo
    cocktail napkin.  Note the creative
    spelling of the word "counter".

    And y'know what?  We decided that he was right!  (Hey! could happen...)  Another phone call to Vince and well, with minor tuning) it's done.  This change (because of the timing) won't cost anything to implement.  Whew!