6900 Hunters Knoll Remodel Project

August 31st

As promised, the roofing felt is now
in place over the new family room.
And the moisture barrier and rein-
forcing wire is in place for the floor
of the new garage to be poured -
tomorrow!

Notice that the left side of the garage
floor had to be raised a foot to level it!
The driveway slab just in front of the
garage will be broken up and repoured
to deal with the slope.
Here's pretty much the whole
garage floor. It's 20' wide by
40' deep, remember.
The cement truck came on
Friday afternoon and now we
have this big old skating rink.

Watch that first step up on
the left side; it's a doozie!
The garage floor runs
out to the edge of the shiny
insulation board. The door
into the back hall will be
inside the garage.