6900 Hunters Knoll Remodel Project

April 4th

Completion date estimate +141 .. and counting...

Hot tubs and Corvettes...


After some excruciating delays the hot tub is here. The hot tub boyz drove their flatbed into the back yard (destroying only one small tree in the process).
It took four of them to lift the hot tub off the truck and onto the deck. Angel had thoughtfully left off the railing on the North side of the deck so this would work.

One of them (the big one) is down in the hole lifting up...

Set into the slot (with Vince to supervise; boy is that coffee cup heavy!) Practically a perfect fit: "We can trim that out..."
In and covered. Now, if we only had electricity...
But only two days later -- We're in, we're drinkin', we're tubbin'. Gael made up a blender-full of Green Death (that's it on the little wagon) and we're a-bubblin' along!
And, I'm a happy boy!.
But....the joy didn't last...
Remember the garage? Here it is with two of the Corvettes...
And here it is with three! The silver '64 will next be seen atop the lift. Watch this space!